Skip to content
Permalink

Comparing changes

Choose two branches to see what’s changed or to start a new pull request. If you need to, you can also or learn more about diff comparisons.

Open a pull request

Create a new pull request by comparing changes across two branches. If you need to, you can also . Learn more about diff comparisons here.
base repository: chavyleung/scripts
Failed to load repositories. Confirm that selected base ref is valid, then try again.
Loading
base: master
Choose a base ref
...
head repository: copyit/scripts-2
Failed to load repositories. Confirm that selected head ref is valid, then try again.
Loading
compare: master
Choose a head ref
Checking mergeability… Don’t worry, you can still create the pull request.
  • 4 commits
  • 1 file changed
  • 4 contributors

Commits on Aug 16, 2026

  1. feat: citybox 增加活动抽奖(每天5次,至9.20) (#527)

    Co-authored-by: Cursor <cursoragent@cursor.com>
    gideonsenku and cursoragent authored Aug 16, 2026
    Configuration menu
    Copy the full SHA
    454e660 View commit details
    Browse the repository at this point in the history

Commits on Aug 17, 2026

  1. fix: citybox 先拉活动列表再按剩余次数抽奖

    Co-authored-by: Cursor <cursoragent@cursor.com>
    gideonsenku and cursoragent committed Aug 17, 2026
    Configuration menu
    Copy the full SHA
    053fa2a View commit details
    Browse the repository at this point in the history

Commits on Aug 18, 2026

  1. fix: citybox refresh active list before each draw

    Poll trigger_active_list every round so remaining draw count comes
    from the server instead of a single snapshot. activeDrawTimes is now
    only a loop safety cap.
    
    Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
    gideonsenku and claude committed Aug 18, 2026
    Configuration menu
    Copy the full SHA
    c9919ca View commit details
    Browse the repository at this point in the history
  2. fix: citybox complete all 5 activity draws and report results

    - fix TDZ ReferenceError in draw(): `const data = JSON.parse(data)`
      shadowed the callback parameter and threw before initialization
    - retry on rate-limit responses (请勿重复提交) with backoff instead of
      aborting the loop; raise the inter-draw gap from 800ms to 3s
    - always include draw results in the notification body, including the
      already-signed-in branch
    
    Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
    gideonsenku and claude committed Aug 18, 2026
    Configuration menu
    Copy the full SHA
    3a7394b View commit details
    Browse the repository at this point in the history
Loading