GMK TriggerKey Review: Adjustable Key Travel for Your Mechanical Keyboard
» Read Review
Black Friday is just around the corner, making late October a good time to review your tech budget before the major shopping season begins. Alongside hardware upgrades and accessories, software is another expense worth planning ahead. If you're setting up a new PC or upgrading an existing one, Windows 11 Pro may be worth considering. It includes features such as Remote Desktop hosting, BitLocker drive encryption, and Hyper-V virtualization on compatible devices. Data security is also worth considering when choosing your operating system. Personal files, work documents, and sensitive information can be valuable targets if a device is lost or accessed without authorization. BitLocker can help protect data by encrypting supported drives, adding an extra layer of security when configured appropriately. Before buying, compare Windows editions, check which features you need, and confirm that your device meets the system requirements.To get a head start on your software budget, CDKeyOffer is offering Windows 11 Pro for $26 with code GURU30. Visit the product page to check the latest price, coupon eligibility, and license details. Planning ahead can help you compare offers and make informed decisions before Black Friday.
Microsoft Windows 11 Pro OEM CD-KEY GLOBAL 25.8USD--(after 30% discount GURU30)
Office2024 Professional Plus CD Key Global 20.3USD--(after 30% discount GURU30)
Microsoft Windows 11 Home OEM CD-KEY GLOBAL 23.9USD--(after 30% discount GURU30)
Windows 11 Pro + Office 2024 Pro Plus Keys Pack 32.1USD--(after 30% discount GURU30)
Microsoft Windows 10 Pro OEM CD-KEY GLOBAL 19.5USD--(after 30% discount GURU30)
Microsoft Windows 11 Enterprise LTSC 2024 Key Global17.1USD---(after 30% discount GURU30)
Office2016 Professional Plus CD Key Global 32.8USD--(after 30% discount GURU30)
Office2019 Professional Plus CD Key Global 51.1USD--(after 30% discount GURU30)
Google AI Gemini Pro 18 Months 19.8USD--(after 10% discount GURU10)

HAVN has announced the global launch of its HS 360 and HS 360 VGPU mid-tower cases, bringing the compact members of its panoramic, GPU-oriented chassis range to international markets. The global launch date is 29 October. Manufacturer listings show the standard HS 360 at $199.99 and the VGPU package at $279.99 in the US. The HS 360 had already appeared in Chinese retail earlier in October, so this update is principally about the worldwide rollout, final regional pricing, and the VGPU model’s hardware details. Both cases use a dual-chamber layout that places the graphics card prominently behind a curved panoramic glass panel. The chassis measures 490.9 × 242.1 × 520.9 mm. HAVN says the HS 360 family is 19.4% smaller and 29.5% lighter than its HS 420, while using a revised curved glass profile and a structure it claims is 36% stronger. These percentages compare the manufacturer’s own case designs; they are not independent measurements of airflow or build quality. The key distinction is the graphics-card mounting system. The standard HS 360 supports horizontal GPU installation, while the VGPU variant includes a vertical bracket and PCIe 5.0 x16 riser cable. HAVN’s product listing says the adjustable bracket supports cards from 1.8 to four slots and up to 433mm long. A magnetic airflow divider above the GPU is designed to guide fresh intake air toward the card and reduce recirculation of warm exhaust. HAVN claims this can lower GPU temperatures by up to 6°C; that result is a manufacturer claim and will depend on the GPU, fan layout, ambient temperature, and test conditions.



DDR5 memory prices in Akihabara continued to rise in the latest survey by Akiba PC. The report covers prices observed from October 17 to 24 and was published on October 29. It found increases across several capacities and data rates, with the highest reported price attached to a DDR5-6000 kit containing two 64GB modules. After a recent restock, the 128GB kit was listed at ¥514,800, approximately $2,872 under the requested pricing convention. Akiba PC’s September 12 survey had placed the same configuration at ¥316,980. The increase of ¥197,820 represents a rise of 62.4% since that report. The year-on-year comparison is more dramatic. When the specification was first included in the survey in early October 2025, it cost ¥59,800. Its current listed price is 760.9% higher than that figure. Akiba PC notes that ¥500,000 around October 2025 could have bought a gaming PC equipped with an RTX 5090 or at least an RTX 5080. In the current survey, a 128GB memory kit is listed at a similar amount.

China’s CXMT intends to sell HBM3E memory even though its yield is estimated at 20 to 30 percent. The headline figure matches other reporting from September, so the new element is the stated intention to commercialize parts at that yield level. I could not retrieve the article body, so the sales volumes, customers, and pricing are not confirmed here. Earlier reporting gives context. The Information reported in late August that CXMT had begun small-volume HBM3E production, with early parts going to Alibaba’s T-Head and Cambricon for qualification, and that mass production would expand from 2027. A ChosunBiz report in September cited a front-end yield near 30% and a back-end pass rate near 70% for 8-layer HBM3, which combine to roughly 21%, with an overall figure cited at about 25%. Those numbers refer to HBM3 and do not carry over directly to HBM3E. Yield determines cost per good stack. HBM stacks multiple DRAM dies with through-silicon vias, and a defect in any layer can invalidate the stack. With a composite yield of 20 to 30 percent, most stacks are discarded or downgraded, so the manufacturer must absorb the cost of discarded dies and packaging. Selling at that yield suggests either a pricing strategy that covers the loss, subsidized production, or a calculation that early volume secures customers for later improvements.

Intel has confirmed that its next-generation Nova Lake client processors will use its 18A-P manufacturing process, marking a concrete change in the roadmap for its upcoming desktop and laptop CPUs. CEO Lip-Bu Tan said on the company’s 29 October earnings call that Nova Lake is tracking ahead of schedule and is expected to secure twice as many design wins as Panther Lake had at launch. Intel plans to share more details at CES in January; it has not yet disclosed Nova Lake’s configurations, performance targets, or launch date. The process confirmation matters because Intel had not previously clearly stated which node Nova Lake would use. Intel describes 18A-P as an enhanced version of 18A. Its published process figures claim up to 9% better speed at the same power, or 18% lower power at the same speed, compared with 18A. Those are manufacturing-process comparisons, not promised CPU performance gains. Intel has also described 18A-P as a drop-in replacement for 18A, suggesting it can use the process without redesigning products already targeted at 18A.

HKEPC reports that a large number of Synology NAS devices have been compromised by a ransomware campaign that encrypts files with the .L0CK3D or .L0CK3D. extension and drops a ransom note named read-me3.txt. The note reportedly contains the text C3RB3R INSTRUCTIONS. According to the report, affected users found encrypted files in File Station, including shared folders, enterprise development documents, database images, and routine backup files. Synology has reportedly confirmed the L0CK3D ransomware attack and strongly urged all users to update DSM immediately. The report says the infection is not primarily spreading from infected Windows machines through SMB shares. Instead, security responders traced the attacks to Synology NAS devices exposed to the public Internet. The attackers are reported to have used two remote code execution vulnerabilities with a CVSS score of 10.0 to launch automated attacks. One reported vector involves Docker containers running on the NAS. The source says some organizations run GitLab, Confluence, or other web services in Container Manager and map ports to external networks. It cites recent unauthorized RCE vulnerabilities in GitLab, including CVE-2026-110264 and CVE-2026-97229, and says attackers can use high-privilege container mounts or host-escape flaws to write a malicious script into Linux crond scheduled tasks. This would allow the payload to remain dormant until the scheduled task triggers it.

MSI has announced the PRO MAX EDGE AI+ 11M-008JP, a compact desktop aimed at local AI work, with a launch set for November 5. Its most notable feature is the combination of AMD’s 16-core, 32-thread Ryzen AI Max+ 395 and 128GB of unified memory in a chassis with a volume of just four litres. MSI says the system can run large language models with up to 120 billion parameters locally. That is a vendor capability claim, and actual model support will depend on quantization, software, and workload. The processor integrates Radeon 8060S graphics, so the machine does not need a discrete graphics card for display output or lighter GPU workloads. MSI also positions it for image generation, video editing and 3D design. The graphics and CPU share the system’s unified memory, which gives software more flexibility over how memory is allocated than a conventional setup with a fixed amount of dedicated VRAM. It does not, by itself, establish how fast a particular model will run.


ASUS has announced five ROG power supplies that ship with its ROG Equalizer GPU cable as standard. The models are regional refreshes of the Thor 1200W Platinum III and Strix Platinum families, with retail sales beginning October 30 in Japan. The new cable is the main change: ASUS says its patented conductive bridge balances current across the conductors in a 12V-2x6 connection to reduce uneven loading and localized heat. The cable uses wiring rated for up to 17A and includes a two-color visual indicator intended to show connection status. ASUS describes the raised, embossed cable design as more flexible to route than a conventional sleeved lead. These features address a real builder concern around high-power GPU cabling, but the company has not supplied independent thermal tests in this market announcement. The 17A rating should not be interpreted as a guarantee that every installation or connector condition is safe; proper seating and compatible hardware remain important.

Formula V Line has announced the Crystal Z3 Plus, a mid-tower case with a panoramic, pillarless glass layout and a removable bottom-fan bracket. The case was announced on October 28 and is listed as available, with black and white variants priced at US$79.99 and US$89.99. Those dollar prices are already in U.S. currency and are presented unchanged. The front and left side use tempered-glass panels to expose the interior and lighting. The case’s rear expansion-card bracket can rotate by 90 degrees, supporting conventional horizontal GPU mounting or a vertical presentation facing the glass. A riser cable is optional, so the vertical arrangement requires an extra purchase and should be included in any total-build cost comparison. The distinctive feature is the lower intake arrangement. Air enters through openings along the lower front and side and is directed toward the bottom fans. Rather than making users work around a fixed fan cage when cleaning, the bracket can be removed after loosening two screws. Formula V Line says that makes it easier to remove the dust filter and service the intake area. It ships with three 120mm PA2 fans—two at the bottom and one at the rear—with four-pin PWM control and three-pin ARGB lighting. The chassis supports up to eight 120mm fans overall.



Intel may be developing a new low-power processor family for affordable laptops. According to leaker Jaykihn, the rumored Moon Lake series will use four LPE cores, omit P-cores and operate at TDPs ranging from 6W to 15W. Intel has not announced the chips, and their release date remains unknown. The reported configuration would place Moon Lake below Wildcat Lake. That series is described as an entry-level option for low-cost laptops, with four LPE cores and two P-cores. Its reported TDP range is 10W to 25W. Moon Lake would therefore have fewer CPU cores overall and a lower power target, potentially suiting systems designed for basic computing and longer battery life.
| CPU series | Moon Lake | Wildcat Lake |
|---|---|---|
| P-cores | 0 | 2 |
| LPE cores | 4 | 4 |
| Basic TDP | 6W | 15W |
| TDP range | 6–15W | 10–25W |
Apple has added a 512GB memory configuration to the Mac Studio range. The system uses the M5 Ultra and starts at $24,618, including a 1TB SSD. Apple’s online store currently gives an estimated delivery date of January 28, 2027, or roughly 10 to 12 weeks from order. The previous Mac Studio memory limit was 256GB. The new configuration is available only with the fully enabled M5 Ultra, which has 36 CPU cores and 80 GPU cores. Apple had been expected to introduce this variant in late October. A 16TB SSD configuration raises the listed price to $32,701. Apple charges $12,393 to upgrade from 256GB to 512GB of memory. The new capacity is therefore a significant cost increase for buyers who need to work with larger datasets or models.

GALAX says it is continuing normal operations, with no production facilities closed and products still available through regular sales channels. The company’s clarification responds to rumors about its manufacturing and business activity. It also says Galaxy and Tongde, which are part of the same group, share production facilities and continue operating them as usual. The statement comes after earlier speculation about GALAX’s future following a management change. In April, Palit Group announced that it would manage GALAX’s overseas business. The move led to reports and online discussion suggesting the brand might be leaving the graphics-card market. Palit rejected that interpretation, saying GALAX would continue developing, producing and supporting hardware.

AI tools are changing how people work, from writing and research to coding and content creation. Getting the most out of these tools starts with a PC and software setup that fits your everyday needs. As AI assistants become part of daily workflows, it's a good time to review your operating system, install available updates, and check whether your PC meets the requirements for the tools you want to use. Windows 11 Pro offers useful features for users who need more control over their PC setup. Remote Desktop hosting can help you access your computer remotely, while BitLocker drive encryption and Hyper-V virtualization support compatible security and development workflows. Productivity software matters, too. Office 2024 provides familiar desktop tools such as Word, Excel, and PowerPoint, depending on the edition, for everyday documents, spreadsheets, and presentations.
If you're planning a PC upgrade or refreshing your current setup, CDKeyOffer offers Windows 11 Pro for $25.80 and Office 2024 for $20.30 with code GURU30. Check the product pages for current pricing, coupon eligibility, and license details before purchasing. Choosing software that fits your needs can help you get more out of your PC as AI-powered workflows continue to evolve.
Microsoft Windows 11 Pro OEM CD-KEY GLOBAL 25.8USD--(after 30% discount GURU30)
Office2024 Professional Plus CD Key Global 20.3USD--(after 30% discount GURU30)
Microsoft Windows 11 Home OEM CD-KEY GLOBAL 23.9USD--(after 30% discount GURU30)
Windows 11 Pro + Office 2024 Pro Plus Keys Pack 32.1USD--(after 30% discount GURU30)
Microsoft Windows 10 Pro OEM CD-KEY GLOBAL 19.5USD--(after 30% discount GURU30)
Microsoft Windows 11 Enterprise LTSC 2024 Key Global17.1USD---(after 30% discount GURU30)
Office2016 Professional Plus CD Key Global 32.8USD--(after 30% discount GURU30)
Office2019 Professional Plus CD Key Global51.1USD--(after 30% discount GURU30)
Google AI Gemini Pro 18 Months 17.0USD--(after 10% discount GURU10)

Alienware 32 4K OLED monitor is available. The model, designated AW3226Q, was introduced at IFA 2026 in early September and carries a US price of USD 699.99. The European price was not part of the information I retrieved. The panel is a flat 31.5-inch 4K (3840 × 2160) tandem OLED using an RGB stripe subpixel layout, with a 165 Hz maximum refresh rate. Tandem OLED stacks two emissive layers, which allows higher brightness for a given drive level and can reduce the stress per layer. The RGB stripe arrangement, as opposed to the triangular layout used in some earlier OLED panels, is intended to improve text rendering and reduce color fringing on fine details, which is relevant for desktop and productivity use. Reported feature support includes VESA DisplayHDR True Black 400, Dolby Vision, and standard HDR. True Black 400 certifies a peak brightness of 400 nits with deep black levels, which sits at the lower end of HDR brightness classes but is typical for OLED desktop monitors that prioritize contrast. Connectivity includes two HDMI 2.1 ports and a DisplayPort input. Alienware backs the monitor with a three-year warranty that covers burn-in.




ADATA’s XPG brand has announced the CORE REACTOR III, a fully modular power-supply series offered at 750W, 850W and 1,000W. Its headline feature is XTREME Power Guard, which monitors current through the 12V-2×6 graphics-card power connection and provides visual alerts. XPG says the system can shut off power to that connector if it detects an overcurrent condition. Unlike a conventional PSU protection list that describes only internal circuit safeguards, Power Guard is designed to make a problem at the GPU cable visible to the builder. XPG says an orange LED indicates current imbalance and a red LED indicates an overcurrent event. The PSU can then interrupt output through the 12V-2×6 connection. A two-colour connector is also intended to make incomplete cable insertion easier to spot. The range supports Intel ATX 3.1 and PCIe 5.1 and includes a 12V-2×6 connector rated for up to 600W. XPG specifies power excursions of up to 235% of rated output for 100 microseconds. That is a short transient-load capability, not the continuous power rating: the three models remain rated at 750W, 850W and 1,000W. Buyers should not interpret the excursion number as additional sustained capacity.


ASUS has announced nine configurations of the Vivobook S14 and S16 using Qualcomm’s eight-core Snapdragon X processor. The 14-inch S5408 and 16-inch S5608 combine OLED displays with a 45-TOPS Hexagon NPU, targeting mobile productivity and Copilot+ PC workloads. ASUS says the systems can last up to 30 hours on a charge; that is a manufacturer rating and will vary with display, workload and configuration. Both laptops use the Snapdragon X X1-26-101, an eight-core, eight-thread chip, and Qualcomm Adreno integrated graphics. The integrated NPU is rated for up to 45 TOPS. ASUS positions the systems for AI-assisted everyday work rather than high-end gaming or GPU rendering. The processor’s integrated graphics and NPU share the laptop’s system memory, so available memory capacity matters when running larger applications or local AI workloads. The S16 uses a 16-inch WUXGA OLED screen and weighs about 1.6kg; the S14 has a 14-inch OLED screen and weighs about 1.28kg. ASUS lists 100% DCI-P3 coverage and a 1,000,000:1 contrast ratio for the OLED configuration. Memory options include 8GB or 16GB LPDDR5X, with storage configurations from 256GB to 512GB in the Japanese launch lineup. The memory is onboard, so buyers should choose capacity carefully because it is not a conventional user-upgradable DIMM arrangement.

Logitech has introduced a limited MX Master 4 Developer Edition with a chassis decorated in etched circuit traces and programming-language motifs. The company describes it as a design-focused edition of its existing MX Master 4 rather than a new sensor or wireless platform. Logitech says the mouse retains the flagship model’s features, including customizable haptic feedback, an Actions Ring shortcut button and the MagSpeed scroll wheel. The visual treatment uses syntax marks, markup tags and circuit patterns, with small references to computing culture hidden in the casing. That distinction matters for buyers: the release is chiefly about appearance and a limited-edition positioning. Logitech has not announced a different sensor, tracking specification, wireless protocol or battery capacity for this variant. Its announcement says users get the familiar MX Master 4 performance beneath the new finish.


ASUS has announced a 27-inch Fast IPS gaming monitor with three resolution-and-refresh-rate modes, topping out at 640 Hz. The ROG Strix XG27ACMSR pairs a native WQHD mode at 360 Hz with Full HD at 420 Hz and HD at 640 Hz. The manufacturer’s announcement describes it as a way to choose between higher image detail and exceptionally high refresh rates, depending on the game. The three modes are not simultaneous: the display trades resolution for refresh rate. That distinction matters because the headline 640 Hz figure is tied to HD output rather than the full 2560 × 1440 resolution. For games where fine detail and a large field of view matter, the WQHD 360 Hz option is likely the more relevant setting. The 420 Hz Full HD mode sits between those two priorities. ASUS lists a 0.3 ms response time for the Fast IPS panel.


Apple has refreshed its 14-inch MacBook Pro and 24-inch iMac with the M6 processor. The MacBook Pro gains more CPU and GPU cores and now starts with a 1TB SSD, while the iMac adds Wi-Fi 7 and Bluetooth 6. Both systems are set to ship on Friday, November 6. The MacBook Pro’s M6 has 12 CPU cores and 12 GPU cores, compared with 10 of each in the M5 model. Apple is offering 16GB, 24GB and 32GB memory configurations. The 16GB version provides 153GB/s of memory bandwidth, the same as the previous generation, while the 24GB and 32GB models reach 170GB/s. Storage options are 1TB, 2TB and 4TB; Apple has discontinued the 512GB configuration. The updated laptop retains its predecessor’s chassis, display and ports. Apple also continues to advertise up to 24 hours of video-streaming battery life. The entry-level M6 model costs €2,329 with 1TB of storage, an increase of €100 over the previous model’s current price. Apple has not announced M6 Pro or M6 Max MacBook Pro variants, so buyers seeking those chips will need to look at the existing M5 Pro and M5 Max models.

[ Archive ]